MODERN OFFICE COMPLEX
Downtown Office Building
A 15-story commercial office building featuring sustainable architecture, energy-efficient systems, and modern workspace solutions designed for growing enterprises.
Client
Metroprime Holdings, Inc.
Location
Downtown Business District, Manila
Duration
18 months
Size
38,000 sqm (15 floors + basement parking)
Completed
November 2024
Budget
₱1.8 Billion
Key Features
- ✔ High-efficiency HVAC system and smart energy management
- ✔ LEED-inspired sustainable building design
- ✔ Earthquake-resistant structural engineering
- ✔ Modern lobby with premium finishes
- ✔ Flexible office layouts for enterprise tenants
- ✔ High-speed elevators and automated access systems
- ✔ Basement parking with advanced fire-suppression system
- ✔ Backup power system supporting 100% building load
Project Timeline
Site Preparation & Excavation
January – March 2023
Completed clearing, excavation, soil testing, and shoring installation to prepare the foundation for a multi-level commercial structure.
Structural Works (Foundations to Top Floor)
April – December 2023
Reinforced concrete foundations, core walls, beams, slabs, and roof deck were constructed following seismic and load-bearing standards.
Architectural & Interior Works
January – June 2024
Installation of façade cladding, curtain walls, lobby finishing, flooring, ceilings, doors, and internal partitions across all floors.
MEPF Installations
February – August 2024
Electrical, plumbing, fire protection, HVAC, and security systems installed and tested for full operational reliability.
Commissioning & Turnover
September – November 2024
System testing, safety certification, punch-list completion, and final turnover to Metroprime Holdings.